Four routes up Africa's highest mountain, led by licensed guides from Arusha.
Kilimanjaro is the highest mountain in Africa, and Uhuru Peak stands at 5,895 metres. It is a national park, with park rules, rangers, porters and real altitude. We run four routes of six to eight days on the mountain, which is seven to nine days in total with your arrival and departure day. Each has extra time built in to help you adjust. Compare them below, then ask for a personalised quote. We reply within 24 hours.
Six days on the mountain, seven days in total, on the Marangu route: sleeping in mountain huts with beds, and an extra day at Horombo to help you adjust.
Seven days on the mountain, eight days in total, on the Machame route: rainforest, moorland and a high-altitude climb, with a night at Karanga to help you adjust.
Eight days on the mountain, nine days in total, on the Lemosho route: a quiet western start, a gentle pace and the most time to adjust of the main routes.
Marangu, 6 days on the mountain (7 days total). The only route where you sleep in huts with beds, and the shortest. We add a rest day at Horombo to help you adjust.
Rongai, 7 days on the mountain (8 days total). Starts on the quieter north side. The extra night is how people actually reach the summit.
Machame, 7 days on the mountain (8 days total). Passes through five climate zones, from rainforest to the frozen summit, with a night at Karanga.
Lemosho, 8 days on the mountain (9 days total). Starts on the quiet western side and gives your body the most time to adjust. It is the one we suggest if you have the time.
Not sure which suits you? Tell us your dates and fitness and we will recommend one in your quote.
What to expect on the mountain
A mountain crew. A guide, a cook and porters look after you and your kit.
We watch how you are doing. Guides check your pulse and oxygen levels, not just the timetable.
Summit night. You start after midnight and aim for Uhuru Peak at sunrise. It is the hardest day, and turning around is part of the job, not a failure.
It depends on how much time you have and how you want to sleep. Marangu is the shortest at seven days and the only route with huts and beds. Rongai starts on the quieter north side. Machame passes through five climate zones. Lemosho is the longest at nine days, with the most time to adjust to the altitude.
How many days do I need to climb Kilimanjaro?
Our routes take six to eight days on the mountain, which is seven to nine days in total once you add the arrival and departure day. Marangu is 6 days on the mountain (7 total), Rongai and Machame are 7 (8 total), and Lemosho is 8 (9 total). We build a rest or acclimatisation day into every route because the extra night is what gives most people a realistic chance of reaching the summit.
Is reaching the summit guaranteed?
No. Altitude affects everyone differently, and no operator can promise the summit. Our guides check how you are doing and will turn the group around if they need to. That is a professional decision, not a failure.
Is climbing Kilimanjaro a technical climb?
Kilimanjaro is a high-altitude trek rather than a technical climb. The challenge is the altitude, the cold and the length of summit day, which can take 11 to 14 hours on some routes.
Can I combine Kilimanjaro with a safari or Zanzibar?
Yes. A safari or a few days on Zanzibar can follow after a rest night once you are back from the mountain. There is no game viewing on the climb itself.
What is included in the price?
Each route page lists what is included and excluded, and every quote confirms the current figures. Prices on this page are per person, from, and depend on group size and dates.
Talk to the team in Arusha
Tell us your dates and who is travelling. We reply within 24 hours with a costed itinerary, not a bracket.
We store a language preference and essential cookies so quotes and pages keep working. Optional analytics are used only if you accept. Read the Privacy policy and Terms.